Keep the original finding identifiable
Use the door identifier and location from the inspection schedule wherever possible. Include the report date, photographs and the observed issue, and flag doors that were inaccessible or not included.
If the inspection schedule does not identify doors consistently, agree a numbering approach before the remedial programme begins. That makes it easier to check that the quotation and close-out evidence refer to the same items.
Define the quote scope
Ask the provider to distinguish inspection observations from proposed remedial actions. The appropriate action depends on the door assembly, the observed condition and the building context; a defect label alone does not establish that a full replacement is needed.
Clarify quantities, access arrangements, occupied-building constraints, phasing and any items that require a further survey. Ask providers to identify assumptions and exclusions in their quotations.
- Door reference and location
- Proposed repair or replacement
- Quantity and access requirements
- Programme, exclusions and assumptions
- Completion records expected
Compare like with like
Review whether each quotation addresses the same doors and requested work. Separate any optional items from the core scope, and ask for clarification where proposed methods, quantities or exclusions differ.
Confirm who will carry out the work, what relevant competence and insurance apply, who will supervise it and what handover information will be supplied.
Close the loop
At completion, reconcile the provider's records against the original schedule. Record completed, deferred and inaccessible items separately, and attach photographs or other agreed evidence to the right property and door references.
If the work identifies further issues, create follow-up actions with a clear owner and status rather than treating the original job as fully closed.
Common questions
Can fire door repairs be quoted from an inspection schedule?
The schedule is a useful starting point. A provider may still need a site visit to confirm the assembly, condition, quantities and appropriate scope.
Does every fire door defect mean the door must be replaced?
No. The appropriate action depends on the specific assembly, defect and building context. The responsible team should review the specialist's recommendation and scope.
What evidence should I keep after fire door remedial work?
Agree the handover records for the job. They may include completed door references, descriptions of work, photographs and any relevant product or completion information.
Sources and further guidance
- GOV.UK: Fire Safety (England) Regulations 2022 fire door guidance ↗
- GOV.UK: Fire safety in purpose-built blocks of flats ↗
Guidance can change and requirements depend on the premises and jurisdiction. Check the current source and obtain building-specific professional advice where needed.
READY TO SCOPE THE WORK?
Start with your building or portfolio.
Tell us the service, location, timing and records you already have. We review the requirement before suitable provider options are considered.
Request work →